(a) means a use:
(i) where electrical power is generated;
(ii) where the total power generation capacity is between 10 watts and 1.0 megawatts; and
(iii) that does not include a Wind Energy Conversion System – Type 1 or a Wind Energy Conversion System – Type 2 when listed as a use in a commercial, industrial or special purpose district;
(b) is a use within the Infrastructure Group in Schedule A to this Bylaw;
(c) must not:
(i) exceed the height of the District it is located in, excluding ancillary structures; and
(ii) be located in a required setback area, excluding solar collectors;
(d) must be screened, with the exception of solar collectors;
(e) does not require motor vehicle parking stalls; and
(f) does not require bicycle parking stalls – class 1 or class 2.